An Owner’s estimate is not a price. It is a position you can defend after the award — against the low bid, the change order and the claim — two years later, in front of someone who was not in the room.
Built off the Owner’s own issued documents: every volume read in full, quantities measured to sheet and key note, labour off the prevailing wage determination bound into the contract.
These are the findings that recur. Every one of them is checked on your estimate before the independent reviews even start.
| The error | Where it lives | Effect on the number |
|---|---|---|
| Sell factor added instead of compounded OH&P, bonds and insurance, and escalation are each charged on the one below. Adding them is arithmetically a different operation, and the error grows with the estimate. | Markup basis | understates every line |
| Fund-paid supplements burdened The formula is wage × (1 + burden) + supplement. Supplements paid to funds are never burdened. Reverse the order and the whole craft build-up inflates. | Wage schedule | overstates every craft line |
| Craft vs staff mistaken for direct work vs general conditions The split that matters is what the money buys. Attic stock, mockups, testing of the work, access plant and abatement allowances are direct work whatever crew type they carry. | Reconciliation | confident, false findings |
| Contingency and allowance carried for the same work An allowance is an obligation certain with an unmeasured amount. Contingency is design not yet fixed, and at the bid-document rung it is zero. | Allowances | double-counted |
| Staff durations that stop at Substantial Completion Division 1 positions run to Final Completion. The Construction Agreement article that fixes the gap is what sets the term, and a guard that compares a cell with itself will not catch the shortfall. | General conditions | short by the gap |
| Sales tax taken on material only With no exemption certificate in the documents, contractor equipment is taxed too, grossed up for the design contingency that will become material, plus the rental share of temporary plant. | Pricing basis | understated base |
A benchmark tab that says “within band” beside a value outside it is worse than no benchmark tab. Every guard verdict on your workbook — and the count of guards — is computed from the workbook’s own cells, so none of them can pass vacuously.
Price is set by one number you already have: the estimated construction value. Flat fee per project, confirmed in writing before work begins. No hourly billing and no change orders.
No quote to wait for. Move the slider to your project value.
Four tiers against the construction value you expect, not against the hours it takes me. The turnaround runs from receipt of a complete document set.
Priced with the engagement — bid reconciliation when bids open,
change-order and Force Account reference positions, review of an estimate someone else prepared,
addendum impact revisions.
Bids already opened? Say so and the reconciliation is scoped with the estimate rather
than after it.
On a $10M project the Major tier is 0.15% of construction value — less than the cost of one change order argued without a position to argue from.
Send the project or solicitation number, the date you need the estimate, and a link to the full document set — every volume, not a summary. You get the confirmed tier, the fee and the date back the same business day.
Prefer to write? Put the project number, the date you need it and a document link in an email to the address above. Same reply, same day.
Two boxes are required: a link to the documents, and your email. Everything else speeds up the reply. It reaches equitydevelopmentstrategiesllc@gmail.com and you are done.